Project Description
This project is the design and construction of a 8'sidewalk on the West side and decorative lighting on N. Beach Road from the N. entrance to the beach parking lot to the Sarasota County line to enhance the walkability in the area.Project Location
North Beach Rd. from the North entrance to the beach parking lot to the Sarasota County lineLatest Updates
-
Phase 4 Update
-
Work on this project was delayed to assess the site conditions following Hurricane Helene and Milton.
-
At the March 15 MSTU meeting, the Advisory Board approved moving forward with the design and requested that construction be shifted to FY26.
-
In September, a drainage feasibility study was added to the design scope to evaluate potential drainage improvement options.
-
The Engineer of Record (EOR) presented the drainage feasibility findings, including optional design concepts, to the Advisory Board.
-
The Advisory Board recommended incorporating drainage components into the sidewalk project.
-
The scope and fee for the drainage design was completed and presented to the advisory board they voted to add it to the design. It is being added to the BOCC agenda for April 21st. for approval
-
The BOCC approved the supplamentry work for drainage design. The engineer will begin work on the 60% plans.
Budget
| Phase | Cost |
|---|---|
| Design | $447,640.00 |
| Construction | $3,400,000.00 |
| Total Budget | $3,847,640.00 |
Schedule
| Phase | Estimated Start Date | Forecast Completion | Actual Completion |
|---|---|---|---|
| Design Development | 06/30/2022 | 06/30/2024 |
Project Phase
Design Development
Last Updated
05/06/2026
Project Manager
Raymond Slade
Public Relations
Chad Ray
Email Public Relations
Sponsor Department
Public Works Engineering
Design Engineer/Architect
Johnson Engineering
Construction Contractor
Johnson Engineering