Project Description
Charlotte County has engaged Kimley-Horn and Associates to design the replacement of the Washington Loop Bridge over Prairie Creek. Originally constructed in 1961, the existing bridge has been subject to overtopping during storm events, resulting in periodic closures. The new bridge will be designed to mitigate these issues by elevating the structure to accommodate greater water volumes and higher flow velocities during flooding events.Project Location
Washington Loop Road over Prairie CreekLatest Updates
Project Activities – May 2026
The design team has submitted the Bridge Development Report (BDR), and the County has completed its review and issued approval. The team is now moving forward with the 60% design plans, along with permitting activities for the roadway, bridge, and utilities. The 60% design plans are due January 2027.
Budget
| Phase | Cost |
|---|---|
| Design | $697,238.14 |
Schedule
| Phase | Estimated Start Date | Forecast Completion | Actual Completion |
|---|---|---|---|
| Design Development | 05/07/2025 | 09/03/2027 |
Project Phase
Design Development
Last Updated
05/01/2026
Project Manager
Kelly Slaughter
Public Relations
Chad Ray
Email Public Relations
Project Number
25002277
Sponsor Department
Public Works Engineering
Design Engineer/Architect
Kimley-Horn Engineers