Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
close search

Project Status Updates

Harbor Boulevard Intersection Improvements News Image

Harbor Boulevard Intersection Improvements

Last Updated: 05/04/2026 Category: Roadway Current Phase: Planning and Project Approval

This project incorporates the design of safety improvements to the intersection of Harbor Boulevard and Access Road.

Read More

Peace River Shores Boulevard Road Crossing Pipe Replacements  News Image

Peace River Shores Boulevard Road Crossing Pipe Replacements

Completed 05/04/2026 Category: Roadway

Railroad and stormwater pipe enhancements across Peace River Shores Boulevard

Read More

Riverside Drive Road Crossing Pipe Replacements News Image

Riverside Drive Road Crossing Pipe Replacements

Last Updated: 05/04/2026 Category: Roadway Current Phase: Planning and Project Approval

Stormwater pipe replacements across Riverside Drive between Huckeby Road and Sunny Harbor Drive

Read More

SR 776 - Murdock Circle to Myakka River Bridge Median Landscape Project News Image

SR 776 - Murdock Circle to Myakka River Bridge Median Landscape Project

Last Updated: 05/04/2026 Category: Landscape Current Phase: Design Development

The county, with funding from FDOT, shall construct and maintain landscaping in the median of SR 776 between Murdock Circle and the Myakka River Bridge.

Read More

Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24

Bermont Road Box Culverts Rehabilitations -Road and Bridge FY24

Completed 05/01/2026 Category: Bridges

Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020

Read More

Bridge Scour Study and Countermeasures

Bridge Scour Study and Countermeasures

Last Updated: 05/01/2026 Category: Bridges Current Phase: Design Development

Bridge Scour Study and Countermeasures.

Read More

Burnt Store Water Reclamation Facility Expansion News Image

Burnt Store Water Reclamation Facility Expansion

Last Updated: 05/01/2026 Category: Utilities Current Phase: Design Development

This expansion project will increase wastewater treatment capacity for the Burnt Store service area.

Read More

Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)

Disaster Recovery Site - Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)

Last Updated: 05/01/2026 Category: Disaster Recovery Site Current Phase: Construction

Oyster Creek Bridge Repair (Hurricane Ian FDOT LAP Project)

Read More

Disaster Recovery Site - Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge News Image

Disaster Recovery Site - Rotonda Bridge #014113 - Hurricane Ian Damaged Bridge

Last Updated: 05/01/2026 Category: Disaster Recovery Site Current Phase: Planning and Project Approval

Rotonda  Bridge #014113 - Hurricane Ian Damaged Bridge

See attached location map and bridge pictures.

Read More

Delivering Exceptional Service

Questions? Issues?

Contact Us