Hillsborough Boulevard Water Main Project
Last Updated: 04/16/2026 Category: Utilities Current Phase: Construction
This project will install an eight-inch water main along Hillsborough Boulevard from Yorkshire Street to U.S. 41. The water main will be installed parallel to the Peace River Manasota Water Authority’s 42-inch Phase 2B Pipeline.
South County Regional Park Improvements -Design
Completed 04/16/2026 Category: Parks And Recreation
Ainger Creek Boat Ramp Replacement
Last Updated: 04/14/2026 Category: Parks And Recreation Current Phase: Design Development
This project will improve the overall experience for boaters and visitors by enhancing traffic flow, expanding parking efficiency, and adding new amenities. A pre-manufactured restroom facility will be installed to provide greater convenience for users, and the boat ramp will be relocated to help reduce loading and unloading wait times. Together, these improvements will create a safer, more accessible, and more enjoyable waterfront experience for the community.
Disaster Recovery Site - Hickory Bluff Cemetery
Last Updated: 04/14/2026 Category: Disaster Recovery Site
Disaster Recovery Site - Indian Springs Cemetery
Last Updated: 04/14/2026 Category: Disaster Recovery Site
Disaster Recovery Site - Lt. Carl Bailey Cemetery
Last Updated: 04/14/2026 Category: Disaster Recovery Site
Disaster Recovery Site - Southland Cemetery
Last Updated: 04/14/2026 Category: Disaster Recovery Site
Disaster Recovery Site - Tom Adams Bridge
Last Updated: 04/14/2026 Category: Disaster Recovery Site
Hurricane Ian caused extensive damage throughout the site, including damage to roof, exterior areas, electrical and mechanical issues, sidewalks and structure.
Disaster Recovery Site - Pine Street Signage/Lighting
Last Updated: 04/10/2026